Project Description
Installation of pervious concrete at all drive lanes, parking areas, and sidewalks, as indicated in the SOW. Concrete services included (not limited to):
1) Minimum 6″ stone base to be installed prior to
mobilization.
2) 6″ pervious concrete thickness at all parking areas and sidewalks
3) 8″ pervious concrete thickness at all drive lanes, dumpster areas, and school bus zones